Custom home building New construction Florida building Sarasota

Understanding the Custom Home Building Process in Florida

Weissman Construction

Weissman Construction

Building & Remodeling

Aug 15, 2025
9 min read
Architectural blueprints and building plans on a desk

Building a custom home is one of the most exciting and rewarding experiences you can undertake. Unlike purchasing an existing home, custom building allows you to create a space that perfectly matches your lifestyle, preferences, and needs. However, the process can seem daunting if you don't know what to expect. At Weissman Construction, we guide our clients through every step, making the journey as smooth and enjoyable as possible.

Phase 1: Planning and Pre-Construction
The foundation of any successful custom home begins long before the first shovel hits the ground. This planning phase typically takes 2-4 months and includes several critical steps:

  • Land Selection: If you haven't already purchased land, your builder can help evaluate potential sites for factors like soil conditions, flood zones, and utility access.
  • Design Development: Working with architects and designers to create floor plans that match your vision. This includes deciding on square footage, number of rooms, architectural style, and special features.
  • Budget Establishment: Developing a comprehensive budget that accounts for land, construction, permits, landscaping, and contingencies.
  • Permit Applications: In Florida, building permits are required for new construction. This involves submitting plans to local authorities for review.

Phase 2: Site Preparation and Foundation
Once permits are approved, construction begins with preparing your lot:

  • Clearing and Grading: Removing vegetation, leveling the site, and ensuring proper drainage.
  • Utility Connections: Coordinating water, sewer, electric, and gas connections to the property.
  • Foundation Work: In South Florida, most homes are built on concrete slab foundations due to our high water table. This phase typically takes 2-3 weeks.

Phase 3: Framing and Structure
This is when your home starts to take shape:

  • Framing: The skeleton of your home is constructed, including walls, roof trusses, and floor systems. In Florida, we pay special attention to hurricane strapping and tie-downs.
  • Windows and Doors: Impact-resistant windows and doors are installed, which are required in most South Florida coastal areas.
  • Roofing: Your roof is installed, protecting the interior from the elements.

Florida-Specific Considerations
Building in South Florida comes with unique requirements that your contractor must address:

  • Hurricane Protection: All new construction must meet strict wind load requirements. This includes impact windows, reinforced garage doors, and proper roof tie-downs.
  • Flood Zone Compliance: If your property is in a flood zone, your home may need to be elevated or designed with flood-resistant features.
  • Energy Efficiency: Florida's building code requires energy-efficient construction, including proper insulation and HVAC sizing for our hot, humid climate.
  • Termite Prevention: Pre-treatment of the soil and ongoing prevention measures are essential in Florida.

Phase 4: Mechanical Systems
With the structure complete, the focus shifts to the systems that make your home functional:

  • Electrical: Wiring for lights, outlets, and smart home features is installed.
  • Plumbing: Water supply and drainage systems are roughed in.
  • HVAC: Ductwork and air conditioning systems are installed. In Florida, a properly sized and efficient AC system is crucial.

Multiple inspections occur during this phase to ensure everything meets code requirements.

Phase 5: Interior and Exterior Finishes
This is where your home truly comes to life:

  • Insulation and Drywall: Walls are insulated and covered with drywall.
  • Interior Finishes: Flooring, cabinets, countertops, and fixtures are installed.
  • Painting: Interior and exterior surfaces receive their final colors.
  • Exterior: Stucco, siding, landscaping, and driveways are completed.

Phase 6: Final Inspections and Walkthrough
Before you receive the keys, several important steps occur:

  • Final Inspections: Building officials conduct final inspections to verify code compliance.
  • Punch List: You'll walk through the home with your builder to identify any items needing attention.
  • Certificate of Occupancy: Once all inspections pass, the county issues a CO, allowing you to legally occupy your new home.

Timeline and Budget Expectations
A typical custom home in South Florida takes 8-14 months to complete, depending on size and complexity. Costs vary widely based on:

  • Size and design complexity
  • Quality of finishes and fixtures
  • Site conditions and required site work
  • Current material and labor costs

Working with an experienced local builder like Weissman Construction helps ensure realistic expectations and a transparent process throughout.

Ready to Build Your Dream Home?
Building a custom home is a significant undertaking, but with the right team, it can be an incredibly rewarding experience. At Weissman Construction, we've helped families throughout Sarasota, Venice, and South Florida create homes they love. Contact us today to discuss your vision and learn how we can help make it a reality.

Found this helpful?

Share this article with others who might benefit.

Related Articles

Ready to Start Your Project?

Schedule a consultation to discuss your vision with our experienced team.